How long will your kitchen remodel take, and how long will you be without a working kitchen? Those are related questions with different answers. At Innovative Home Renovations (IHR), we discuss timing in relation to your Project Scope, the decisions ahead and the way your household uses the home.
This guide explains our process and the questions to bring to your project team. It does not assign a universal duration to a kitchen size or remodeling category.
Preparation includes the design decisions and coordinated information needed to prepare the project. On-site work is the activity at your home. Kitchen downtime is the period when the functions you need—such as cooking, washing or refrigeration—are unavailable. Their start and end points can differ.
Ask us which kitchen functions will be affected, when each interruption is expected and what assumptions the schedule depends on. A date for starting on-site work does not describe the full journey from your first conversation through completion.
Our IHR Renovation Roadmap includes Commitment, Onboarding, Design, Planning, Build and Warranty. These are stages of the client journey; they do not all mean your kitchen is out of use.
Design develops the layout, design direction, selections and related decisions. Tell us what makes your kitchen difficult to use and what you want to preserve. The floor plan, cabinetry, appliances, surfaces and lighting need to be considered together.
Our Cabinet Design Track develops through Initial Cabinet Design, Revised Cabinet Design and Final Cabinet Design. Showroom work, applicable Trade Partner input and final decisions contribute to the coordinated design. Ask which decisions are needed next and what information will help you make them.
Planning converts the design into coordinated information for execution: the Project Scope, Plan Set, Cost Analysis, schedule and Build documentation. The Project Scope defines the work and responsibilities. The Selections List records selections, specifications and decision status.
Before treating a proposed date as settled, discuss unresolved decisions, product availability, existing-condition questions, and the permit or inspection requirements applicable to your project. These need to be understood in relation to the actual work.
The Fixed Price Build Agreement (FPBA) authorizes the Build Stage after the Project Scope and Cost Analysis are complete. Pre-Build belongs within Build: it is the preparation after that agreement and before on-site construction begins.
Ask us to explain the Build Schedule and what must be ready before your kitchen is taken out of use. The on-site activities depend on the Project Scope. They may include Site Deconstruction, framing, work on building systems, installation of finishes and cabinetry, and applicable inspections. This is not a universal construction sequence; the coordinated plan for your home governs the work.
Our approved closeout meeting sequence is the Initial Substantial Completion Client Meeting, the Final Substantial Completion Client Meeting and the Client Project Completion Meeting. We use Substantial Completion Task for a remaining completion item.
The Client Project Completion Meeting is the formal handoff and walkthrough of operation, use, care and documentation. Ask us what is covered at each meeting, how any open Substantial Completion Tasks will be followed through and how the transition to Warranty will work for your project.
For scope changes arising after the Final Project Scope Meeting, we use an Additional Work Request (AWR), kept as a separate controlled record. If you are considering additional or different work, bring the idea to us and discuss its effect on the Project Scope, Investment and Build Schedule. An initial discussion is not authorization to proceed.
Tell us about the facilities you need every day, access through the home, and work, sleep, mobility, pet or household constraints. Discuss these before choosing whether to remain at home. Useful questions include:
A temporary setup is not, by itself, proof that staying is appropriate. We need to discuss the actual work and household needs; temporary electrical or plumbing arrangements require appropriate professional review.
Read Do I Need to Move Out to Remodel? Where to Live During Your Renovation for more on that decision.
Tell us what you hope to change, which household constraints matter and whether you have a preferred date or a firm deadline. Use Get Started to begin a conversation about your home and the timing questions your project needs to answer.